Step 1

Communication

Share us your projects information. If you have the drawing for your project, that will be great. We will give our professional suggestion to upgrade your project. If not, never mind, tell us your requirement, we special design for you. After confirming the drawings, we give you the detail quotation.

Step 2

Confirm

After confirm the drawings and the price, we will make a contract for you with the stamp and signature. Before producing, we will send again the drawing to you to confirm, if no problem, we will move to nest step.

Step 3

Produce

After confirm the everything details and get the deposit, we will work out the shop drawings then produce. Polishing, rust removal, welding, painting and packing. Then whole production process, we have special quality inspector to check and control. Also you can come to our factory to check the quality too.

Step 4

Load

Before one week finish the production, we will inform you to arrange the balance and shipment. Also we can help arrange the shipment too. After communicating and confirming the date, we will give the loading schedule to the factory. Normal one day we can load 6×40HQ shipping container.

Step 5

Install

After loading, we will send you the installation drawings and installation guidance to guiding assemble the building. What’s more B.H Housing here for you, when you face the problem, professional solution, just feedback to us, we will give you the detail professional solution. If you need, we also can send you the engineer to supervisor the construction on site.

Step 6

Feedback

After you finishing the house, that will be highly appreciated you share us your project photos and installation difficult you faced on the site. We upgrade and update our technical.